Your success in PMP PMP is our sole target and we develop all our PMP braindumps in a way that facilitates the attainment of this target. Not only is our PMP study material the best you can find, it is also the most detailed and the most updated. PMP Practice Exams for PMP PMP are written to the highest standards of technical accuracy.

Also have PMP free dumps questions for you:

Page: 1 / 76
Total 918 questions Full Exam Access
Question 1
- (Topic 2)
Which risk management strategy seeks to eliminate the uncertainty associated with a particular upside risk by ensuring that the opportunity is realized?
My answer: -
Reference answer: C
Reference analysis:

None

Question 2
- (Topic 4)
Which type of estimating can produce higher levels of accuracy, depending upon the sophistication and underlying data built into the model?
My answer: -
Reference answer: C
Reference analysis:

None

Question 3
- (Topic 3)
Which of the following techniques is used during Control Scope?
My answer: -
Reference answer: B
Reference analysis:

None

Question 4
- (Topic 5)
Which of the following is a statistical concept that calculates the average outcome when the future includes scenarios that may or may not happen?
My answer: -
Reference answer: D
Reference analysis:

None

Question 5
- (Topic 3)
Which schedule development tool and technique produces a theoretical early start date and late start date?
My answer: -
Reference answer: A
Reference analysis:

None

Question 6
- (Topic 1)
Which element does a project charter contain?
My answer: -
Reference answer: C
Reference analysis:

None

Question 7
- (Topic 5)
Which of the following is an example of the simplest fixed-price contract?
My answer: -
Reference answer: B
Reference analysis:

None

Question 8
- (Topic 1)
Which process involves determining, documenting, and managing stakeholders' needs and requirements to meet project objectives?
My answer: -
Reference answer: A
Reference analysis:

None

Question 9
- (Topic 3)
Which of the seven basic quality tools is especially useful for gathering attributes data while performing inspections to identify defects?
My answer: -
Reference answer: D
Reference analysis:

None

Question 10
- (Topic 3)
In which process might you use risk reassessment as a tool and technique?
My answer: -
Reference answer: B
Reference analysis:

None

Question 11
- (Topic 1)
Which of the following is a narrative description of products, services, or results to be delivered by a project?
My answer: -
Reference answer: A
Reference analysis:

None

Question 12
- (Topic 1)
A tool and technique used in the Develop Project Charter process is:
My answer: -
Reference answer: B
Reference analysis:

None

Question 13
- (Topic 2)
You are assigned to implement the project control plan. What should you do to ensure the plan is effective and current?
My answer: -
Reference answer: A
Reference analysis:

None

Question 14
- (Topic 1)
Which is an output of the Collect Requirements process?
My answer: -
Reference answer: A
Reference analysis:

None

Question 15
- (Topic 3)
Which of the following is developed from the project scope baseline and defines only that portion of the project scope that is to be included within a related contract?
My answer: -
Reference answer: B
Reference analysis:

None

Question 16
- (Topic 3)
Which input provides suppliers with a clear set of goals, requirements, and outcomes?
My answer: -
Reference answer: A
Reference analysis:

None

Question 17
- (Topic 4)
On what is project baseline development established?
My answer: -
Reference answer: B
Reference analysis:

None

Question 18
- (Topic 2)
Using values such as scope, cost, budget, and duration or measures of scale such as size, weight, and complexity from a previous similar project as the basis for estimating the same parameter or measurement for a current project describes which type of estimating?
My answer: -
Reference answer: C
Reference analysis:

None

Question 19
- (Topic 4)
What cost control technique is used to compare actual project performance to planned or expected performance?
My answer: -
Reference answer: D
Reference analysis:

None

Question 20
- (Topic 1)
Which of the following is an input to the Develop Project Charter process?
My answer: -
Reference answer: C
Reference analysis:

None

Question 21
- (Topic 1)
The product scope description is used to:
My answer: -
Reference answer: B
Reference analysis:

None

Question 22
- (Topic 3)
Which of the following is a tool and technique used in all processes within Project Integration Management?
My answer: -
Reference answer: B
Reference analysis:

None

Question 23
- (Topic 3)
Which tool and technique is used in Conduct Procurements?
My answer: -
Reference answer: C
Reference analysis:

None

Question 24
- (Topic 2)
How should a stakeholder who is classified as high power and low interest be grouped in a power/interest grid during stakeholder analysis?
My answer: -
Reference answer: A
Reference analysis:

None

Question 25
- (Topic 2)
Which is an input to the Verify Scope process?
My answer: -
Reference answer: D
Reference analysis:

None