Question 1
- (Topic 5)
The cost benefit analysis tool is used for creating:
My answer: -
Reference answer: B
Reference analysis:

None

Question 2
- (Topic 4)
The iterative and interactive nature of the Process Groups creates the need for the processes in which Knowledge Area?
My answer: -
Reference answer: B
Reference analysis:

None

Question 3
- (Topic 2)
Payback period, return on investment, internal rate of return, discounted cash flow, and net present value are all examples of:
My answer: -
Reference answer: B
Reference analysis:

None

Question 4
- (Topic 1)
Which of the following strategies is used to deal with risks that may have a negative impact on project objectives?
My answer: -
Reference answer: D
Reference analysis:

None

Question 5
- (Topic 1)
In the Initiating Process Group, at what point does the project become officially authorized?
My answer: -
Reference answer: A
Reference analysis:

None

Question 6
- (Topic 4)
Which item is a cost of conformance?
My answer: -
Reference answer: A
Reference analysis:

None

Question 7
- (Topic 3)
Which of the Perform Quality Assurance tools and techniques may enhance the creation of the work breakdown structure (WBS) to give structure to the decomposition of the scope?
My answer: -
Reference answer: B
Reference analysis:

None

Question 8
- (Topic 3)
Which of the following is a component of three-point estimates?
My answer: -
Reference answer: B
Reference analysis:

None

Question 9
- (Topic 1)
Which document describes the necessary information to determine if a project is worth the required investment?
My answer: -
Reference answer: D
Reference analysis:

None

Question 10
- (Topic 3)
Which of the following are inputs to the Plan Procurements process?
My answer: -
Reference answer: A
Reference analysis:

None

Question 11
- (Topic 1)
The business needs, assumptions, and constraints and the understanding of the customers needs and high-level requirements are documented in the:
My answer: -
Reference answer: B
Reference analysis:

None

Question 12
- (Topic 1)
Which statement is true about the project management body of knowledge?
My answer: -
Reference answer: B
Reference analysis:

None

Question 13
- (Topic 3)
The traditional organization chart structure that can be used to show positions and relationships in a graphic top-down format is called a:
My answer: -
Reference answer: D
Reference analysis:

None

Question 14
- (Topic 3)
While implementing an approved change, a critical defect was introduced. Removing the defect will delay the product delivery. What is the MOST appropriate approach to managing this situation?
My answer: -
Reference answer: A
Reference analysis:

None

Question 15
- (Topic 3)
Which of the following is an output of the Conduct Procurements process?
My answer: -
Reference answer: B
Reference analysis:

None

Question 16
- (Topic 3)
Which illustrates the connection between work that needs to be done and its project team members?
My answer: -
Reference answer: D
Reference analysis:

None

Question 17
- (Topic 1)
PMBOI Guide is a standard that describes:
My answer: -
Reference answer: B
Reference analysis:

None

Question 18
- (Topic 3)
Which activity involves ensuring that the composition of a projects configuration items is correct?
My answer: -
Reference answer: C
Reference analysis:

None

Question 19
- (Topic 4)
Which Perform Quality Control tool graphically represents how various elements of a system interrelate?
My answer: -
Reference answer: B
Reference analysis:

None

Question 20
- (Topic 1)
Inputs to Identifying Stakeholders include:
My answer: -
Reference answer: A
Reference analysis:

None

Question 21
- (Topic 3)
In complex projects/ initiating processes should be completed:
My answer: -
Reference answer: B
Reference analysis:

None

Question 22
- (Topic 3)
A process is defined as:
My answer: -
Reference answer: A
Reference analysis:

None

Question 23
- (Topic 2)
Sending letters, memos, reports, emails, and faxes to share information is an example of which type of communication?
My answer: -
Reference answer: D
Reference analysis:

None

Question 24
- (Topic 1)
An element of the project scope statement is:
My answer: -
Reference answer: A
Reference analysis:

None

Question 25
- (Topic 3)
Which of the following will provide the basis for estimating, scheduling, executing, and monitoring and controlling project work?
My answer: -
Reference answer: A
Reference analysis:

None

Page: 1 / 76
Total 918 questions Full Exam Access