What Refined 3v0-624 Exams Is

we provide High value VMware 3v0-624 free download which are the best for clearing 3v0-624 test, and to get certified by VMware VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam. The 3v0-624 Questions & Answers covers all the knowledge points of the real 3v0-624 exam. Crack your VMware 3v0-624 Exam with latest dumps, guaranteed!

VMware 3v0-624 Free Dumps Questions Online, Read and Test Now.

Page: 1 / 10
Total 123 questions Full Exam Access
Question 1
A company would like to utilize its current infrastructure but wants to adopt virtualization to consolidate its environment. Currently, the infrastructure contains:
• server with 2 x 8 cores CPUs and 96G8 of memory
• backup LAN with a single physical switch
• production LAN
• sufficient datastore performance as determined by the storage team Match the existing infrastructure component to its appropriate concept.
3V0-624 dumps exhibit
Solution:
Risk = Backup LAN has a single physical Switch
Constraint = Server with 2x8 Core CPU with 96 GB
Assumption = Sufficient datastore performance as determined by storage team
Requirement = Production LAN

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 2
A company is outsourcing its support operations to an external service provider and plans to complete the project by April 1.
• The external Support engineers must have the ability to power cycle, create, and edit virtual machines settings within their assigned vSphere site.
• The company maintains three vCenter servers in Enhanced Linked Mode that are run as virtual machines in the supported infrastructure.
• The vCenter servers will be supposed by the external service provider.
• Each vCenter server is connected to its own local Platform Services Controller and MSSQL database server.
• The company will provide escalation support and physical access on a per request basis.
• 99.9% ESXi host uptime is required in this environment, but no SLA has been specified for the hosted applications.
Drag each statement to its appropriate concept.
3V0-624 dumps exhibit
Solution:
Risk --> Missing the April 1 deadline...
Constraint --> Remote support...
Assumption --> The company is...
Requirement --> The SLA allows for..

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 3
You have been tasked with creating a vSphere 6.5 data center design for an organization. After interviewing key stakeholders and subject matter experts for a new implementation, it was determined that:
1. Existing network infrastructure should be sufficient.
2. HIPPA compliance must be maintained.
3. Mission critical applications must be recoverable.
4. Provide training to staff to ensure they can support the implementation.
5. IT department capital investment has been agreed upon and approval is nearly complete.
For each statement, you must determine if the statement should be categorized as an assumption, constraint, requirement or risk.
Match each Business Statement by dragging the red Statement buttons (S1-S5) over the text of the appropriate Categorization.
NOTE: Statements can have more than one Categorization.
3V0-624 dumps exhibit
Solution:
3V0-624 dumps exhibit

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 4
Categorize the tools as providing either Availability or Recoverability.
3V0-624 dumps exhibit
Solution:
AvailabilityFTHARecoverabilityProactive HAvCenter HAvSphere ReplicationVADP

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 5
A customer is deploying a mission-critical Oracle database with high SLA requirements, including high performance and high availability. The customer has chosen to purchase an All-Flash vSAN solution.
Which three storage policies should be used? (Choose three.)
My answer: -
Reference answer: CDE
Reference analysis:

None

Question 6
When configuring HA, which admission control policy should be used?
My answer: -
Reference answer: B
Reference analysis:

None

Question 7
A customs has requested a vSphere 6.5 deployment design where ESXi hosts are provisioned with Auto Deploy. The customer requires that certificates can be automatically refreshed and renewed from the vSphere Web Client for ESXi hosts.
Which certificate policy should be configured for vCenter Server?
My answer: -
Reference answer: B
Reference analysis:

None

Question 8
When considering server consolidation, plan on running vCPUs per core.
My answer: -
Reference answer: A
Reference analysis:

None

Question 9
The hardware operations team is planning to purchase new ESXi hosts for the upcoming budget year and is requesting recommendations on the type of servers to purchase for a web application. The web application consists of hundreds of small virtual machines (1 vCPU and 8GB of RAM) that are members of a software cluster.
The solution should have these abilities:
• recover from ESXi host hardware failures
• zero downtime for a limited number of critical virtual machines (VMs)
• migrate running VMs between ESXi hosts without interruption to the operating system
• perform these functions using VMware ESXi servers, vCenter Server, and high-speed network interfaces What are the three functional requirements and their associated VMware technologies? (Choose three.)
My answer: -
Reference answer: ACD
Reference analysis:

None

Question 10
View the Exhibit.
3V0-624 dumps exhibit
Referring to the Exhibit, identify the two single points of failure in this design. (Choose two.)
My answer: -
Reference answer: EF
Reference analysis:

None

Question 11
A business organization has different types of network traffic, and all the types of traffic must be kept separated. The design architect knows that the number of required networks is greater than the number of physical ports in the system.
Which three choices can the architect use to keep the traffic separated? (Choose three.)
My answer: -
Reference answer: BCD
Reference analysis:

None

Question 12
A customer has requested a high availability option for its data center in the event of power failure and the loss of connectivity to a virtual machine.
Which three vSphere features support fault tolerance? (Choose three.)
My answer: -
Reference answer: ACE
Reference analysis:

None

Question 13
The customer has two sites that must operate independently of each other in the event of a WAN failure. During normal operations, administrators from each site must be able to manage the other site through the vSphere Web Client.
Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?
3V0-624 dumps exhibit
My answer: -
Reference answer: D
Reference analysis:

https://www.opvizor.com/understanding-the-impacts-of-mixed-version-vcenter-server-deployments/

Question 14
You have been provided with a list of requirements for a vSphere Design. For each requirement, categorize the requirement as a component of the conceptual, logical, or physical design.
Drag a requirement button (R1-R8) over to the green space provided beside the corresponding Design Phase.
3V0-624 dumps exhibit
Solution:
3V0-624 dumps exhibit

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 15
A customer has storage arrays from two different storage vendors at two different sites. The customer warts to restore operations at the secondary site in the event of a disaster.
Which VMware technology must be used to meet this requirement?
My answer: -
Reference answer: A
Reference analysis:

None

Question 16
Drag each option to its appropriate concept.
3V0-624 dumps exhibit
Solution:
Risk --> DC facilities are at capacity end...Requirement --> Existing change management guidelines...Constraint --> App licencsing costs must be minimizedAssumption --> vsphere 6.5 features will meet the...

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 17
A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.
• There are two possible clusters that the database virtual machine could reside in: Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.
• All ESXi hosts contain dual Intel Xeon E5-2650 v3 processors (ie: 2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.
Given this scenario, which three statements are true? (Choose three.)
My answer: -
Reference answer: ABC
Reference analysis:

None

Question 18
According to VMware-recommended best practices, on which cluster should each of the services be placed?
3V0-624 dumps exhibit
Solution:
ManagementDNS ServersVCSAAD DomainNTP ServersResourceMS ExchangeMS SQLApache Web

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 19
A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.
• The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.
• The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.
• QA Teams will be able to recreate the environment that is required for a specific application.
• Individual virtual machines in the blueprint are being continually updated with newly available software packages.
• The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)
My answer: -
Reference answer: ABDF
Reference analysis:

None

Question 20
Customer Requirements:
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization wants three defined virtual machine performance levels:
- Gold Tier – High workload VMs
- Silver Tier – Medium workload VMs
- Bronze Tier – Development workload VMs
The organization has eight ESXi hosts that can be used in the design. Five of the hosts are older “medium performance” hosts, while the last 3 are newer “high performance” hosts that provide better resources when compared to the other hosts. The organization has provided a list of requirements that the design must meet:
- Gold Tier virtual machines should run only on high performance servers, unless no high performance servers are available. They should also be allocated 75% of overall available resources regardless of placement.
- Silver Tier virtual machines should run only on medium performance servers, unless no medium performance servers are available. They should also be allocated 25% of overall available resources regardless of placement.
- Bronze Tier virtual machines should run only on medium performance servers. They should also receive a 35% subset of resources from those allocated to the Silver Tier.
Design Requirements:
Create a logical design that shows resource allocation and cluster policies needed to meet the customer’s requirements. The design should include:
- All required server(s)
- All required resource(s)
Place host(s) in the required DRS group(s). Place virtual machines in the appropriate resource pool(s). Connect parent to child resource pool connector(s) where needed. Connect the appropriate affinity connector(s) where needed.
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
Solution:
Check below for answer solution
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 21
A company provides critical financial and statistical data for several major banks.
• The company ensures that the bank's customer data is secure and that analytics data is available when needed.
• Customers rely on this data before making crucial business and financial decisions.
• Just a few minutes of downtime can result in loss of revenue and trust.
• To meet high-availability requirements, the company's IT infrastructure components must be redundant.
• The company established three data centers across the globe and interconnected them with high-speed WAN links.
• Due to the rapid growth of its customers and their increasing demands, the compute, network, and storage
were procured and managed by the company's enterprise system administrators group. What are its two key challenges? (Choose two)
My answer: -
Reference answer: AD
Reference analysis:

None

Question 22
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has provided information via requirements gathering. Evaluate each statement and determine if the requirement is functional or non-functional.
Match Requirements on the left by dragging the red buttons (R1-R9) over the text of the appropriate Classification.
3V0-624 dumps exhibit
Solution:
3V0-624 dumps exhibit

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 23
You have been tasked with creating a vSphere 6.5 design for an organization. The customer wants to ensure isolation in the network but does not know when to incorporate physical networks, VLANs and PVLANs.
Evaluate the design requirement and determine the isolation method to satisfy the design.
Match each Design Requirement on the left by dragging the red Requirement buttons (R1-R5) over the text of the appropriate Isolation Method.
NOTE: Multiple Design Requirements may fit each Isolation Method.
3V0-624 dumps exhibit
Solution:
3V0-624 dumps exhibit

Does this meet the goal?
My answer: -
Reference answer: A
Reference analysis:

None

Question 24
A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
• The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
• The new servers have a 90-day delivery time.
• A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.
• The security team will continue to utilize its current investments and VM Encryption for the new environment.
• The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
My answer: -
Reference answer: AB
Reference analysis:

None

Question 25
You are a platform designer constructing a physical design from an existing approved logicaldesign. Out of the vendor proposals, there are two proposed solutions that could be used. Which of the following options is the most important factor when making a decision?
My answer: -
Reference answer: C
Reference analysis:

None

Page: 1 / 10
Total 123 questions Full Exam Access