Question 1
A company has requested a new vSphere 6.5 design that will allow it to finally break the 80% virtualization barrier by virtualizing its resource-intensive application.
• The application is highly available by design and includes application-aware clustering software capable of operating as a fully distributed system.
• The company's Application Version 2.0 consists of 386 small applications and middleware with non-persistent storage and 24 database virtual machines at each data center.
• When coupled with a proper load balancing solution, this application can continue operating even with the loss of an entire data center, but the small applications and middleware tiers within a data center must exist within the same broadcast domain.
• The database tier is tightly controlled with a firewall policy that only allows middleware tier access, and is replicated to other sites using a dedicated circuit.
Which two application requirements apply to this scenario? (Choose two.)
• The application is highly available by design and includes application-aware clustering software capable of operating as a fully distributed system.
• The company's Application Version 2.0 consists of 386 small applications and middleware with non-persistent storage and 24 database virtual machines at each data center.
• When coupled with a proper load balancing solution, this application can continue operating even with the loss of an entire data center, but the small applications and middleware tiers within a data center must exist within the same broadcast domain.
• The database tier is tightly controlled with a firewall policy that only allows middleware tier access, and is replicated to other sites using a dedicated circuit.
Which two application requirements apply to this scenario? (Choose two.)
Question 2
A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.
• The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.
• The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.
• QA Teams will be able to recreate the environment that is required for a specific application.
• Individual virtual machines in the blueprint are being continually updated with newly available software packages.
• The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)
• The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.
• The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.
• QA Teams will be able to recreate the environment that is required for a specific application.
• Individual virtual machines in the blueprint are being continually updated with newly available software packages.
• The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)
Question 3
A customs has requested a vSphere 6.5 deployment design where ESXi hosts are provisioned with Auto Deploy. The customer requires that certificates can be automatically refreshed and renewed from the vSphere Web Client for ESXi hosts.
Which certificate policy should be configured for vCenter Server?
Which certificate policy should be configured for vCenter Server?
Question 4
A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
• The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
• The new servers have a 90-day delivery time.
• A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.
• The security team will continue to utilize its current investments and VM Encryption for the new environment.
• The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
• The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
• The new servers have a 90-day delivery time.
• A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.
• The security team will continue to utilize its current investments and VM Encryption for the new environment.
• The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
Question 5
In the vCenter HA configuration below, drag the two correct components to the blank boxes in this diagram. The same component may be used more twice (Choose two.)
Solution:
Platform services controller
Does this meet the goal?
Solution:
Platform services controller
Does this meet the goal?
Question 6
You have been tasked with creating a vSphere 6.5 design for an organization. The organization has a mission critical application that must be able to obtain its required CPU and memory resources even if contention occurs. You must determine which vSphere service(s) will allow for resources to be reserved.
Associate the vSphere Service on the left with the corresponding Reservation Type on the right by dragging the red button (S1-S6) over the text of the Reservation Type.
NOTE: A vSphere Service may allow for more than one Reservation Type or none at all.
Solution:
Does this meet the goal?
Associate the vSphere Service on the left with the corresponding Reservation Type on the right by dragging the red button (S1-S6) over the text of the Reservation Type.
NOTE: A vSphere Service may allow for more than one Reservation Type or none at all.
Solution:
Does this meet the goal?
Question 7
You have been provided with a list of requirements for a vSphere Design. For each requirement, categorize the requirement as a component of the WRT, RTO, RPO, MTD, and Recoverbility.
Drag a requirement button (R1-R8) over to the green space provided beside the corrisponding Design Phase.
Solution:
Does this meet the goal?
Drag a requirement button (R1-R8) over to the green space provided beside the corrisponding Design Phase.
Solution:
Does this meet the goal?
Question 8
When configuring HA, which admission control policy should be used?
Question 9
A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.
In this scenario, when two source types are supported? (Choose two.)
In this scenario, when two source types are supported? (Choose two.)
Question 10
A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept
Solution:
Does this meet the goal?
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept
Solution:
Does this meet the goal?
Question 11
Customer Information
The Customer Labtown has a new vSphere 5 environment with one of their line of business applications recently being virtulized. Labtown requires that their Webserver, Database Server, and Fileserver for their line of business app be created into a vAPP. The VM's should start up in a specific order to insure the application starts correctly after an outage or reboot. Labtown also wants the best performance possible out of each VM. There is three hosts in the cluster each running the same CPU and Memory specifications. each host is running at 60% utilization right now. Labtown doesn't have any budget for more hosts.
Create a logical vAPP design for Labtowns Line of Business Application Requirements
- The server must boot in the following order: DB, Fileserver, WebServer
- Each VM must perform the best it can with the current cluster configuration Instructions
- Place the three VM's on the vAPP
- Place the boot order boxes ontop of each VM to indicate the VM's boot order
- Place the VM stencil for each VM in the DRS rules section if you wish to apply DRS rules to the design
- As long as VM's are on the vAPP stencil marks will be scored
See the solution below
Solution:
Check below for answer solution
Does this meet the goal?
The Customer Labtown has a new vSphere 5 environment with one of their line of business applications recently being virtulized. Labtown requires that their Webserver, Database Server, and Fileserver for their line of business app be created into a vAPP. The VM's should start up in a specific order to insure the application starts correctly after an outage or reboot. Labtown also wants the best performance possible out of each VM. There is three hosts in the cluster each running the same CPU and Memory specifications. each host is running at 60% utilization right now. Labtown doesn't have any budget for more hosts.
Create a logical vAPP design for Labtowns Line of Business Application Requirements
- The server must boot in the following order: DB, Fileserver, WebServer
- Each VM must perform the best it can with the current cluster configuration Instructions
- Place the three VM's on the vAPP
- Place the boot order boxes ontop of each VM to indicate the VM's boot order
- Place the VM stencil for each VM in the DRS rules section if you wish to apply DRS rules to the design
- As long as VM's are on the vAPP stencil marks will be scored
See the solution below
Solution:
Check below for answer solution
Does this meet the goal?
Question 12
A company would like to leverage snapshot technology on vSphere 6.5. Which configuration supports taking snapshots?
Question 13
A company is implementing a new cluster to support its end user desktop workloads.
• The workload is required to support 200 virtual machines.
• Each end-user desktop is configured with two vCPUs, 8GB of RAM, and 40GB of thick-provisioned disk space.
• The architect has expressed concerns that virtual machine swap files will till the 8.5TB datastore available to the cluster.
Which two strategies would address the architect's concern? (Choose two.)
• The workload is required to support 200 virtual machines.
• Each end-user desktop is configured with two vCPUs, 8GB of RAM, and 40GB of thick-provisioned disk space.
• The architect has expressed concerns that virtual machine swap files will till the 8.5TB datastore available to the cluster.
Which two strategies would address the architect's concern? (Choose two.)
Question 14
Which of the following needs to be considered when determining the amount and size of thehosts required for a virtual design?
Question 15
You have been tasked with creating a vSphere 6.5 data center design for an organization. The customer has decided to virtualize their database application and has provided specific design requirements. You must determine how these requirements map to the design characteristic(s).
Match Database Requirements with Design Characteristics by dragging the red button (R1-R5) over the text of the appropriate Design Characteristic.
NOTE: Database Requirements can be mapped to more than one Design Characteristic.
Solution:
Does this meet the goal?
Match Database Requirements with Design Characteristics by dragging the red button (R1-R5) over the text of the appropriate Design Characteristic.
NOTE: Database Requirements can be mapped to more than one Design Characteristic.
Solution:
Does this meet the goal?
Question 16
The customer has two sites that must operate independently of each other in the event of a WAN failure. During normal operations, administrators from each site must be able to manage the other site through the vSphere Web Client.
Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?
Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?
Question 17
According to VMware-recommended best practices, on which cluster should each of the services be placed?
Solution:
ManagementDNS ServersVCSAAD DomainNTP ServersResourceMS ExchangeMS SQLApache Web
Does this meet the goal?
Solution:
ManagementDNS ServersVCSAAD DomainNTP ServersResourceMS ExchangeMS SQLApache Web
Does this meet the goal?
Question 18
A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.
• There are two possible clusters that the database virtual machine could reside in: Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.
• All ESXi hosts contain dual Intel Xeon E5-2650 v3 processors (ie: 2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.
Given this scenario, which three statements are true? (Choose three.)
• There are two possible clusters that the database virtual machine could reside in: Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.
• All ESXi hosts contain dual Intel Xeon E5-2650 v3 processors (ie: 2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.
Given this scenario, which three statements are true? (Choose three.)
Question 19
A global financial company has requested assistance with a new cross-site failover design between two sites which will support business critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance Drag each statement to its correct concept
Solution:
Risk--> App downtime..
Constraint --> The product of the desing must...
Assumption --> A limited number of storage...
Requirement --> Latency between the two sites...
Does this meet the goal?
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance Drag each statement to its correct concept
Solution:
Risk--> App downtime..
Constraint --> The product of the desing must...
Assumption --> A limited number of storage...
Requirement --> Latency between the two sites...
Does this meet the goal?
Question 20
A company is designing a new vSphere cluster to support a mission-critical application.
• The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.
• The application consists of a group of 16 virtual machines, each with 8 vCPU configured. Which solution satisfies the availability requirements?
• The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.
• The application consists of a group of 16 virtual machines, each with 8 vCPU configured. Which solution satisfies the availability requirements?
Question 21
A number of factors determine how many physical adapters are needed in a host design. Whichof the following is not one of them?